Mercedes-Benz, Rastatt

(2024 -)

Project H244/248 MMA Z1 Structural Systems (UG35/36 + UB-line)
125 robots – offline programming and simulation development, online programming, commissioning, optimization
14 PLCs – design, programming, commissioning
Electrical materials / electrical installation / control cabinet production

Client: Thyssenkrupp System Engineering GmbH

Scope of services:
Design in E-Plan
Electrical installation
Control cabinet production
VIBN
Robot path programming
Creation and uploading of OLPs on-site
Commissioning, optimization, and production support
PLC programming, commissioning, optimization, and production support

Technologies and systems used:
E-Plan Electric P8
Delmia V5
VIBN (RF::Sute)
Robots: KUKA robots KRC4/5
Control: SIEMENS S7-300/S7-1500
Visualization: INTEGRA